Browse Digital Heritage

Constructional Clays in the Replica House. Figure 2.13 of LHotH, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Architecture, BACH_afterlives, Fieldwork, Fieldworking, People
Summary: 
Mirjana Stevanović inspects the mud brick walls of the Replica Neolithic House in the early stages of its construction in 1999. Figure 2.13 of Last House on the Hill, printed edition
Using the Harris Matrix. Figure 2.12 of the Last House on the Hill, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Event, Features, Fieldwork, Fieldworking, People, Spaces_Places
Summary: 
Using the Harris Matrix in the BACH Area a) constructing the sequence of depositional events in 1999; (b) matrix of the northeast platform (F.173). Figure 2.12 of the Last House on the Hill, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Architecture, Burial, Day by Day, Event, Features, Fieldworking, Food: Storing Preparation and Eating, Photography/Videography
Summary: 
Video record of Events in the BACH Area of Çatalhöyük on June 14, 2001;
Video-recording discussions in the BACH shelter. Figure 2.11 of LHotH, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Burial, Event, People, Photography/Videography
Summary: 
Video-recording a discussion about the burials under the north-central platform (F.162) in 2001. Figure 2.11 of Last House on the Hill, printed edition
Aerial Photography in the BACH shelter. Figure 2.10 of LHotH, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Fieldwork, Fieldworking, People, Photography/Videography, Spaces_Places
Summary: 
Aerial Photography in the BACH Shelter: a) The mountaineering trapeze set up for aerial photographs in the BACH Area; (b) aerial photograph of the Building 3 in 2002. Figure 2.10 of Last House on the Hill, printed edition
Recording field drawings with EDM. Figure 2.9 of LHotH, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Features, Fieldwork, Fieldworking, People
Summary: 
Using the EDM to document measurements on a field drawing in 2000. Figure 2.9 of Last House on the Hill, printed edition
Filling out unit sheets in 2000. Figure 2.8 of LHotH printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Event, Fieldwork, Fieldworking, People
Summary: 
Filling out unit sheets/forms in 2000 in the BACH Area. Figure 2.8 of Last House on the Hill, printed edition
A filled-in unit recording form. Figure 2.7 of LHotH, printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Day by Day, Fieldwork, Fieldworking, Guide
Summary: 
An example of a filled-in unit recording form/sheet (unit 6641). Figure 2.7 of Last House on the Hill, printed edition
Excavating Burials in Building 3. Figure 2.3 of LHotH printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Burial, Event, Fieldwork, Fieldworking, People
Summary: 
Excavating burials in Building 3: (a) documenting the skeletal remains in 2001; (b) excavating a child’s burial in 2000. Figure 2.3 of Last House on the Hill, printed edition
Collecting a sample for micromorphological analysis. Figure 2.6 of LHotH printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Event, Fieldwork, Fieldworking, People
Summary: 
Wendy Matthews collecting a sample for micromorphological analysis from the ‘clean’ area of the collapsed roof of Building 3. Figure 2.6 of Last House on the Hill, printed edition
Sorting heavy-residue. Figure 2.5 of LHotH printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Fieldwork, Fieldworking, People
Summary: 
The Turkish team sorting heavy-residue samples in the compound in 1998. Figure 2.5 of the Last House on the Hill, printed edition
Ruth Tringham and Mirjana Stevanović study cross-section through the collapsed roof. Fig. 2.2 of LHotH printed edition
Community: 
BAÇH Team, Catalhoyuk Research Project
Category: 
Architecture, Event, Fieldwork, Fieldworking, People
Summary: 
Ruth Tringham and Mirjana Stevanović study cross-section through the collapsed roof provided by the N-S baulk in Building 3 in 1998. Figure 2.2 of Last House on the Hill, printed edition

Search

Keywords