Filling in the BACH Area in 2004

Summary: 
Filling in the BACH Area in 2004: (a) preparing Spaces 87, 88, and 89 (b) emptying sacks of dry ‘sterile’ soil into the vacuum left by Building 3. Figure 2.22 of Last House on the Hill, printed edition
Description: 

Composite photo of filling in the BACH Area on August 2, 2004 created as Figure 22 of Last House on the Hill, printed edition: (a) preparing the partially excavated Spaces 87, 88, and 89 for further excavation before filling in (escavation was continued in Space 87 in 2012; (b) emptying sacks of dry ‘sterile’ soil into the vacuum left by Building 3. Original filenames: a) 20040802_eth_178.jpg, b) 20040802_eth_204.jpg

Protocol: 
Keywords: 
conservation
Collection: 
Original Date: 
2011
Creator: 
Contributor: 
Author: 
Ruth Tringham